Friday, 31 March 2017

The Snail of Uttarakhand


For Uttarakhand, ‘Climate Change’ somehow seems to be a heavy term derived out of a thesaurus. While entire set of nations and international forums are banging their heads to mitigate the imminent irreversible risks that climate change has posed on humans, Uttarakhand still has its own pace of lopsided actions, reactions, counter-actions or no action.

2013 Uttarakhand tragedy was not enough for us to understand the drastic effects, where we lost everything within minutes. Our ability to forecast issues whether critical or long-term, our preparedness to resolve issues, our intent to bring matters into the Plan Do Check Act (PDCA) cycle, our sense of observing and learning from others’ mistakes or excellence and the innate moral responsibility towards our own children and grand-children today are all put to test.

The ban on any type of mining in Uttarakhand by the Hon’ble High Court of Uttarakhand has brought this matter to the fore-front. It’s not that mining in Uttarakhand had gone illegal within 10 days of new govt formation based on which the Hon’ble High Court had to take this pioneering step to set this in order. During the tenure of last government, illegal mining and its cartelization in the state had reached its zenith or nadir, whatever it may suit, when ‘illegal mining mafia’ started physical and weapon led assaults on the departmental teams that led to serious injuries and even fatal casualties. As a result, lowly paid employee already sustaining in penury could not react against the ‘muscle-power’, which in turn escalated the already gung-ho spirit of the cartels.

Recently, when the Maori tribe in New Zealand after 140 years of legal battle, won its bid to pronounce Whanganui river as their ‘living ancestor’ we also woke up to the cause and pronounced our revered rivers Ganga and Yamuna as ‘living entities’.  As a follow-up to save the ‘living-entities’, the ban on mining in Uttarakhand has opened up a Pandora’s Box of issues relating to Revenue and Employment within the state and a lot of noise is being heard across the forums that have taken a direct hit.

However, in the entire conundrum, one pertinent issue of grass-root level has been neglected out rightly. State PWD has informed that due to Non-availability of Raw or Processed Stone Aggregate, 120 proposed roads in the Kumaun region itself will be affected and it seems that these roads may not see the light of the day soon, at least by the preparedness standards of the state PWD and other road development agencies of Uttarakhand.

Keeping in view the drastic effects of processes involved in conventional technology of road construction, many sustainable technologies have been developed in the western part of the globe, which have been proven far more effective and sustainable when it comes to combating climate change and providing quality roads in considerably lesser time. The respective regulatory bodies, after conducting detailed tests have accredited such technologies to be incorporated in Indian conditions also. Despite statutory certifications & guidelines by Indian Road Congress (IRC), Central Road Research Institute (CRRI) and Ministry of Road Transport and Highways (MoRTH), PWD and allied agencies of many states like Uttarakhand have not been able to upgrade themselves to the rising demand of ‘sustainable development’ across the globe.

A set of sophisticated cold miller operating on a new road stretch

A Road being constructed without the Stone Aggregate in NE with a New German Technology accredited by Indian Road Conress (IRC)










Non-availability of Stone Aggregate impacts a road project considerably since the ‘pavement/base’ attracts usage of stone aggregate and due to the non-availability of it in the vicinity leads to carriage from far-flung areas/rivers and/or stone crushers. While the PWD and allied agencies of the state, in its scheduled rates for a locality have a fixed cost pertinent to that area, the fact of non-availability of material has many a times not been incorporated while preparing the Detailed Project Report (DPR). As a result the ‘proposed/budgeted cost’ of the project in many cases becomes impractical v/s the ‘actual cost’ of that road project. The matter becomes more critical, when the department has not been able to upgrade itself on the nuances of DPR preparation and the ‘consultant’ provides a cost that is completely impractical to construct a road in any typical terrain. 

In numerous cases, it has also been observed and accepted by the state agencies that the DPR consultant did not even carry the ‘Soil Testing’, which happens to be a mandatory step before conceiving a project and preparing the DPR. 

Link attached Para 6 (viii) and Para 6(ix): http://pmgsy.nic.in/MEC_UT_09.01.14.pdf 

In various instances, an erroneous DPR can delay a critical road project for almost 4 yrs as has happened in Uttarakhand for a road connecting the proposed capital town of Garsain through a hamlet to the mainstream market on Ramnagar-Delhi axis.

To hide behind the errors, the state bodies than create a negative environment against an approved sustainable new technology, to be costly, against the erroneous cost derived (without adhering to the standard operating procedures (SOPs) and missing on to a critical aspect of ‘soil testing’), that too after a lapse of considerable time ranging between 3-4 years.

Another critical issue that holds up the project beyond imagination is its funding pattern. In case the project has been sanctioned and funded by a central agency like Pradhan Mantri Gram Sadak Yojna (PMGSY)/National Rural Roads Development Agency (NRRDA), the actual fault lines appear so wide that the local populace may wait for another 1-2 years to see a road in their area that grossly defeats the vision of these bodies. On each amendment to the DPR, the state body like Uttarakhand Rural Road Development Agency (URRDA) while accepting its fault has to seek permission from the NRRDA practically on each and every aspect like a. Cost Escalation and b. Usage of any other sustainable technology. The fun time begins when NRRDA from its cocoon without understanding the local dynamics that led to an erroneous DPR floats correspondence out of its purview.

Stone Aggregate Quarrying and Crushing has created havoc for the Environment in recent years

Hot Mix Plants over its Life Cycle conisderably add-on to the Carbon Foot Print of the Projects and the Location


In many instances the entire matter also becomes amusingly frustrating when logic defying discussions of ill-informed technocrats also lead to project appreciation from scratch. While all the other states due to its progressive policy making and adopting ‘aggregate-less pavement’ technologies are aggressively increasing their road network, Uttarakhand PWD and other allied agencies still seem to come out of its slumber and match up to the imminent requirements of ‘New India’ and an economically prosperous Uttarakhand.


It may well be a possibility that the state bodies also intend to be governed by the Hon'ble High Court to include environment-friendly smart technologies in road construction that would save considerable time to the tax-payers of the state. 

However, the question remains whether Uttarakhand really intends to become a Tech Friendly state, required, due to its geographical constraints or the same indomitable ‘highlander spirit’ of our decision makers will govern us to walk 4-5 days across ridges, jungles and ravines to reach our destinations. Somehow, it seems a herculean task for them to understand that effective roads only provide economic and strategic security to a nation and to a Himalayan State like Uttarakhand that borders an itchy adversary, it becomes imminent like yesterday.